WFPP VIFOR PHASE 1 - MV COLLECTOR SYSYEM

Project Information
  • Customer:
    VESTAS ROMANIA
  • Date:
    04/09/2024 - 30/05/2025
  • Location:
    Pogoanele , Romania
  • Category:
    Renewable Energy
  • Industry:
    Energy Sector
Project Description

The project involves the complete construction and installation of the wind farm collector system, covering the following key activities:

  • Trench Construction: Excavation and preparation of trenches for laying the cables.
  • Cable Laying: Installation of power, optical fiber (FO), and earthing cables in trenches.
  • Supply of Cable Connectors and Joints: Providing all necessary connectors and joints for the cable system.
  • Assembly of Connectors and Joints: Installation and assembly of cable connectors and joints according to the technical specifications.
  • Testing and Commissioning: Performing tests to ensure system functionality and commissioning of the collector system.
  • Optical Fiber Supply and Splicing: Supply of optical fiber cables and conducting splicing works to ensure communication between wind turbine generators (WTG) and the substation.
  • Earthing Cable Supply and Connections: Provision and installation of earthing cables, ensuring connections on both the WTG and substation sides, as per the detailed design.
  • Fiber Distribution Frame Installation: Supply, installation, and splicing of the 19" Fiber Distribution Frame, enabling communication between WTGs and the Vestas Online Business (VOB) server cabinet.
  • Cable Logistics and Management: On-site transportation, uploading, and management of cables, including length checking and cable drum handling.
  • Documentation: Providing detailed design studies, drawings, reports, and other required documentation:
    • Final design documentation, including area plans and as-built drawings.
    • Wind Farm cabling and earthing as-built drawings.
    • Marking and protection documentation for cables and joints in their as-built positions.
    • Earthing cable testing and commissioning reports, including Factory Acceptance Tests (FAT).
    • Type and routine tests for FO and earthing cables.
    • Specifications for cables and accessories.

This comprehensive project ensures the efficient and reliable installation of the medium-voltage collector system, critical for the operation of the wind farm, and is completed with full testing, documentation, and certification.

Project Information
  • Customer:
    VESTAS ROMANIA
  • Date:
    04/09/2024 - 30/05/2025
  • Location:
    Pogoanele , Romania
  • Category:
    Renewable Energy
  • Industry:
    Energy Sector