Sikagard-680 S Betoncolor, Masonry & Concrete Coating, Exterior, Thixotropic, 20 kg
SIKA
Sika is a global leader in specialty chemicals for the construction and industrial sectors. The company develops and supplies innovative products and systems for bonding, sealing, damping, reinforcing, and protecting structures. With a strong focus on sustainability and performance, Sika serves a wide range of applications including concrete production, waterproofing, roofing, flooring, and structural strengthening.
Read more| Protective Coating for Concrete and Masonry Sikagard-680 S Betoncolor is a one-part, solvent-based, decorative methacrylic protective coating for concrete and cementitious surfaces. It protects against aggressive atmospheric influences and promotes a self-cleaning effect on the treated surfaces. It is available as a clear coating. Sikagard-680 S Betoncolor complies with the requirements of EN 1504-2 as a protective coating.
| ||||||||||||||||
UsageAs a protective and decorative coating for:
Advantages
Packaging
ColourThixotropic liquid
| ||||||||||||||||
Technical Information Diffusion Resistance to Water Vapour Dry film thickness d = 140 µm Equivalent air layer SD, H2O = 2,4 m Requirement for SD, H2O ≤ 5 m Carbonation Resistance Dry film thickness d = 130 µm Equivalent air layer SD, CO2 = 429 m Requirement for SD, CO2 ≥ 50 m | ||||||||||||||||
Application Information Layer Thickness Minimum dry film thickness (DFT) to achieve full durability characteristics (CO2 diffusion, adhesion after thermal cycling, etc.) = 101 μm. Ambient Air Temperature +5 °C minimum / +35 °C maximum Relative Air Humidity < 85 % Dew Point Substrate and ambient temperature must be at least 3 °C above dew point. Substrate Temperature +5 °C minimum / +35 °C maximum Waiting Time / Overcoating Waiting time between coats:
Note: Refresher coats of Sikagard-680 S Betoncolor can be applied without priming if the existing coating is fully bonded and is thoroughly cleaned. Times are approximate and will be affected by film, thickness and changing ambient conditions particularly temperature and relative humidity. Applied Product Ready for Use Full cure: ~5 days (+20 °C). Dust dry: ~30 minutes (+20 °C). Times are approximate and will be affected by film, thickness and changing ambient conditions particularly temperature and relative humidity. |