Skip to Content

Sikafloor-CureHard-24, Surface Hardener, 25Kg

Flooring
SIKA

Sika is a global leader in specialty chemicals for the construction and industrial sectors. The company develops and supplies innovative products and systems for bonding, sealing, damping, reinforcing, and protecting structures. With a strong focus on sustainability and performance, Sika serves a wide range of applications including concrete production, waterproofing, roofing, flooring, and structural strengthening.

Read more
https://www.polytrade.global/web/image/product.template/40698/image_1920?unique=c88dc28

1,074.48 lei Tax Included
1074.48 RON

Not Available For Sale

You have already submitted a query for this product today.

This combination does not exist.

Sodium silicate surface hardener, anti-dust treatment, sealant and transparent anti-evaporator for concrete

Sikafloor® CureHard-24 is a transparent sodium silicate-based, one-component, high-solids liquid used as an anti-evaporation agent, hardener and sealer for fresh or hardened concrete.

Use
  • New or old horizontal concrete surfaces where a hard surface with light to moderate abrasion resistance is required, e.g. warehouses, industrial factories, shops, shopping centers, parking lots, car workshops, hangars, etc.
  • On concrete slabs without specific requirements or standard conditions of anti-evaporation protection
  • Suitable for indoor or outdoor applications
  • Dust protection for precast concrete elements
  • Suitable for protection against seepage (Principle 1, method 1.2 of EN 1504-9)
  • Suitable for physical resistance (Principle 5, method 5.2 of EN 1504-9)
Advantages
  • Ready to use
  • Easy to apply
  • Improved chemical and abrasion resistance compared to untreated concrete
  • Prevents the appearance of dust on the concrete surface
  • A slight reduction in water loss from freshly poured concrete
  • Improved maintenance
  • No yellowing
  • Deeply penetrates the support
  • No solvents
  • Colorless and odorless
pack

Containers 15 l, drums 200 l

Color

Clear liquid

Typical technical data
APPROVALS / CERTIFICATIONS

Impregnation for the protection of the concrete surface in accordance with EN 1504-2:2004, protection against infiltration and physical resistance, having the Declaration of Performance 02 08 03 04 004 0 000001 1180, authenticated by the notification of the certification body 1020 responsible for factory production control, factory production control conformity certificate 020025682, accompanied by the CE mark.

Chemical base

Sodium silicate in aqueous solution

Validity period

24 months from the date of production

Storage conditions

The product must be properly stored in the original packaging, sealed and undamaged, in dry conditions at temperatures between +5°C (+41 °F) and +30°C (+86 °F). Protect the product from freezing.

Density

~1.2 kg/l (~10 lb/gal) (at +20 °C (+68 °F))

Solids content in percent by weight

~24%

System structure

Anti-evaporation agent: 1–2 layers Hardener / Sealant: 1–2 layers

Abrasion resistance

50 mg or 81.5 % increase in abrasion resistance compared to the untreated sample (EN 5740-1)
(concrete C(0.70) according to EN 1766) (Taber test, wheel H-22, 1000 g (35.3 oz) / 1000 cycles)

Impact resistance

60 Nm (class III: ≥ 20 Nm) (EN 6272-1)
Concrete sample (MC(0.40) according to EN 1766

Tensile bond strength

4.8 N/mm 2 (696 psi) (EN 1542)
Concrete sample (MC(0.70) according to EN 1766

Penetration depth

5.5 mm (0.217 in) (EN 1504-2)
Concrete sample (MC(0.70) according to EN 1766

Water absorption

w = 0.03 kg/m 2 ×h 0.5 (EN 1062-3)
(on a surface with w > 1 kg/m 2 h 0.5 )

Application
Ambient air temperature

+5 °C (+41 °F) min. / +35 °C (+95 °F) max.

The relative humidity of the air

100% max.

Support temperature

+5 °C (+41 °F) min. / +35°C (+95 °F) max.

Moisture content in the substrate

Can be applied to fresh concrete without surface water.

Waiting Time / Recoating

When 2 coats are required, to achieve maximum densification, the second coat can be applied 2-4 hours after applying the first coat.

TemperatureTime
+5 °C (+41 °F)~ 3.5 hours
+10 °C (+50 °F)~ 3 hours
+20 °C (+68 °F)~ 2 hours
+25 °C (+77 °F)~ 1.5 hours

Waiting times are approximate and will be affected by changes in ambient conditions, especially temperature and relative humidity.

Drying time

The surface is dry to the touch after 2 hours at a temperature of +20 °C (+68 °F). The maximum sealing and hardening effect is achieved after ~7 days at a temperature of +20 °C (+68 °F).

The applied product is usable after
Support temperatureFull reinforcement
+10°C (+50 °F)~ 6 hours
+20°C (+68 °F)~ 5 hours
+30°C (+86 °F)~ 4 hours

Note: Times are approximate and will be affected by changes in ambient parameters and substrate.

Consumption

0.15–0.25 l/m 2 /layer (4–7 m 2 /l/layer). These values ​​are theoretical and do not take into account additional consumption due to surface porosity, surface profile, unevenness or losses, etc.

Yield

4–7 m 2 /l/layer

SUPPORT QUALITY

Fresh concrete The surface must be free of standing water and have sufficient strength to support the finishing processes.

Cured / Old Concrete Surfaces must be sound, open textured, clean, free of ice, cement laitance, standing water, oils, grease, coatings, loosely adhering particles and other surface contaminants. If in doubt, apply to a test surface first. For optimal results, in the case of concrete floors, Sikafloor® CureHard-24 is applied 7-14 days after pouring or after sufficient hydration of the concrete.

PREPARATION OF THE SUPPORT

Fresh concrete

The concrete must be prepared by appropriate finishing/compaction techniques, either manually or mechanized.

Hardened / old concrete

The substrate must be prepared by suitable cleaning methods such as high pressure water washing or using cleaning machines. Before applying the product, all dust, dirt, loose and friable material must be completely removed from all surfaces, preferably with a broom and/or vacuum cleaner.

APPLICATION

Fresh concrete

As soon as the surface is firm to tread on, apply the material in a continuous coat using a high volume, low drag spray unit, using a quantity sufficient to keep the surface wet for at least 30 minutes.

After about 30-45 minutes, your material will start to gel and become slippery. Lightly dampen the material with a water sprayer to reduce slippage and then work the surface with a soft-bristled broom or floor scrubber for 10 to 20 minutes. After about 20 minutes, the material will gel. Rinse the floor and remove any excess material using a squeegee, mop or wet-dry vacuum.

Hardened / old concrete

Apply the material in a continuous coat using a high volume, low drag spray unit.

To ensure maximum penetration, brush the treated surface with a soft-bristled broom or floor scrubber. Lightly moisten the material with a water sprayer and process the surface again for 10 to 20 minutes. After this process, rinse the floor and remove any excess material using a squeegee, mop or wet-dry vacuum cleaner.

On porous, rough or brushed surfaces, a second coat may be required.

For large surfaces and high consumption, the application, brushing and removal of excess material will be mechanized with the help of industrial cleaning machines.

Due to subsequent chemical reactions, water tightness will gradually increase, while the maximum sealing and hardening effect is reached after 7 days. Depending on the frequency of cleaning, the intensity of the surface gloss gradually increases during the first 90 days.

The product can also be used in combination with Sikafloor® - CureHard GL.

CLEANING OF TOOLS

Clean all tools and application equipment with Thinner C immediately after use. The already hardened material can only be removed mechanically.