SikaScreed HardTop-70, Outdoor Quick Screed
SIKA
Sika is a global leader in specialty chemicals for the construction and industrial sectors. The company develops and supplies innovative products and systems for bonding, sealing, damping, reinforcing, and protecting structures. With a strong focus on sustainability and performance, Sika serves a wide range of applications including concrete production, waterproofing, roofing, flooring, and structural strengthening.
Read moreCementitious, rapid hardening, high strength, floor levelling screed and repair mortar SikaScreed® HardTop-70 is a cementitious, one-part, rapid hardening, high strength, floor levelling screed and repair mortar for industrial floors. The Product provides a low maintenance, high mechanical and abrasion resistant smooth screed, suitable as a finished surface or a base layer for resin based coating. Layer thickness 10 to 200 mm (7.87 in). Suitable for both internal and external use. | |||||||||||||||||||||||||||||||||||||||
Usage
Advantages
Packaging25 kg (55.1 lb) bags ColourSmooth, grey finish | |||||||||||||||||||||||||||||||||||||||
Typical Product Data
| |||||||||||||||||||||||||||||||||||||||
ApplicationFresh mortar density ~2.25 kg/l (~18.8 lb/gal) Layer Thickness 10 to 200 mm (7.87 in) Minimum thickness guidelines:
*Loading / use of the floor and the presence of underfloor heating will determine the thickness of the screed. Minimum thickness indicated is for unheated and lightly loaded floors. Also refer to the Sika Method Statement: “SikaScreed® HardTop Range”. Product Temperature +10 °C (+50 °F) minimum / +25 °C (+77 °F) maximum (fresh mortar) Ambient Air Temperature +10 °C (+50 °F) minimum / +30 °C (+86 °F) maximum Mixing Ratio ~2.8 to 3.0 Litres of water for 25 kg (55.1 lb) of powder Substrate Temperature +10 °C (+50 °F) minimum / +30 °C (+86 °F) maximum Pot Life ~25 minutes at +20 °C (+68 °F) Waiting Time / Overcoating
Refer to the Method Statement: Sikafloor® HardTop-60 / 70 Fast Screed Systems and to individual Product Data Sheets for further information. Times are approximate and measured at +20 °C (+68 °F) and >50 % r.h. Application times will be affected by changing substrate and ambient conditions, layer thickness and water content. Applied Product Ready for Use ~18 hours (without coating or impregnation application). Time is approximate and measured at +20 °C (+68 °F) and >50 % r.h. Time will be affected by changing substrate and ambient conditions, layer thickness and water content. Consumption ~2.1 kg/m 2 per mm. This figure is theoretical and does not allow for any additional material due to surface porosity, surface profile, variations in level or wastage, etc. EQUIPMENT SUBSTRATE PREPARATION Abrasive blast cleaning or planing / scarifying equipment. MIXING Small to Medium Volumes
Large Volumes
APPLICATION
SURFACE FINISHING
CURING
MIXING Small to Medium Volumes
Large Volumes
APPLICATION BONDED SCREEDS Bonding Bridge
Note: If SikaScreed®-20 EBB bonding bridge has dried, they must be removed mechanically and replaced before application of SikaScreed® HardTop-70. APPLICATION Bonded, Unbonded and Floating Screeds
Surface Finishing
Curing
CLEANING OF TOOLS Clean all tools and application equipment with water immediately after use. Hardened / cured material can only be removed mechanically. |